Iran National Steel Industrial Group projects:


Implemented projects- total water supplyprojectTotal water supply project, respecting environmental standards, a sharp reduction in electrical energy consumption and manufacturing plants' waste are the main features of ...


Kowsar rolling plant constructionThis rolling line with a nominal capacity of 550,000 tons and with the latest industry technologies is able to produce a variety of simple and ribbed ...


Planning and Information Technology Unit• Set up administrative automation as a step towards the realization of an electronic organization (2005) • Set up a contact rig for high-speed point-to-point communications support ...


Sludge condensation systemThis project is implemented along with environmental objectives of National Group and to recycle total water supply project waste. Location: Iran National Steel ...


Reconstruction of five linesBy the end of the war and start of a new round of development along with achieving 5-year objectives of the government, Iran National Steel Industrial ...


Implementing steelmaking furnace 1 replacement projectImplementing steelmaking furnace 1 replacement project was utilized by the construction of a bottom discharge furnace (EBT), a 60- t ladle furnace, a 4-line casting station with ...


Construction of a steelmaking additives warehouseOperation time: September 2010 Location: Steel plant Executive activities: In order to create appropriate conditions for maintenance, ease of load discharge and easy ...


Collecting old lines and constructing new lines between Kowsar rolling plant and railway entranceLocation: Iran National Steel Industrial Group plants' range, between Kowsar rolling plant and the company's entrance Operation time: April 2008 ...


Indoor material transmission systemOperation time: July 2008 Location: steel plant hall Equipment: The above system consists of three bunkers each with a capacity of 60 cubic meters ...


Outside material transmission systemOperation time: October 2010 Location: outside yard of steel plant In the above system materials sent are discharged by trucks with a maximum capacity of 15 t, ...


MAIN FACTORY
AHVAZ - IRAN
Km 9 of Ahvaz-Khoramshahr Road
B.O. BOX: 61335-775
Tel : (+98) 613 331-0050-59
Fax: (+98) 613 331-0106-59
ISO CERTIFICATES INSIG ISO Certified for OHSAS 18001, Managment System 9001 and 14001 from TUV also ISO 10015 from DNV.